五号特工组第二部免费播放,69香蕉视频,国产精品最新网址,日本美女视频网址,久久伊人国产,综合久久2o19,欧美精品久久

RB-C test block - NB/T47013-2015 Standard test block for non-destructive testing of pressure equipment

The RB-C test block is designed according to the requirements of ultrasonic testing of the toroidal butt joint of the curved surface of pressure equipment. The test block is suitable for ultrasonic testing of the toroidal butt joint with the radius of curvature of the test surface ranging from 80mm to 250mm.

The RB-C test block is designed according to the requirements of ultrasonic testing of the toroidal butt joint of the curved surface of pressure equipment. The test block is suitable for ultrasonic testing of the toroidal butt joint with the radius of curvature of the test surface ranging from 80mm to 250mm.探傷試塊


探傷試塊探傷試塊

Test method: Select the diagonal probe that has been verified and place it at the position a in the diagram. Move the probe back and forth so that the direct sound beam can get the maximum reflection echo on the φ2mm cross through hole. Adjust the echo amplitude to 80% of the height of the full screen, record the dB value at this time, which is the first point. The probe is placed at position b in the diagram, and the probe is moved forward and backward so that the direct sound beam can get the maximum reflection echo on the φ2mm cross through hole. Adjust the echo amplitude to 80% of the height of the full screen, record the dB value at this time, which is the second point. The probe is placed at position c in the diagram, and the probe is moved forward and backward so that the direct sound beam can get the maximum reflection echo on the φ2mm cross through hole. Adjust the echo amplitude to 80% of the height of the full screen, record the dB value at this time, which is the third point. The probe is placed at position d in the diagram, and the probe is moved back and forth so that the direct sound beam can get the maximum reflection echo on the φ2mm cross through hole. Adjust the echo amplitude to 80% of the height of the full screen, record the dB value at this time, which is the fourth point. Connecting the above points into a curve is the base line specified in the standard.


Online purchase:www.ndtmall.cn

阿城市| 绵阳市| 德格县| 聂拉木县| 云龙县| 宁化县| 哈巴河县| 循化| 河津市| 奉贤区| 城固县| 沾化县| 苏尼特左旗| 禄丰县| 改则县| 高雄市| 石阡县| 调兵山市| 茌平县| 绵竹市| 奉节县| 江川县| 图片| 平乡县| 二连浩特市| 晋州市| 彩票| 南郑县| 通许县| 永康市| 左权县| 吉木乃县| 社旗县| 岳西县| 清河县| 库尔勒市| 勐海县| 武穴市| 抚顺县| 南木林县| 福建省|